Building Project:
Build on to the gym a dining hall/chapel complex, with a porch on the front and side. – Total Goal - $150,000.00 - We have $100.000.00 so far.
Miscellaneous Projects:
Replace a dozen of the oldest cabin mattresses - $85.00 ea.
Kitchen utensils (ex. A pancake pouring funnel) - $300.00
Round tables and chairs for the new dining hall - $500.00 each set
Finish paying off the Gator (four wheel utility vehicle) - $2,500.00
Strengthen all the top bunk safety guards - $300.00
Program Projects:
Extend the bouldering wall another 20 feet - $600.00
Replace a dozen life jackets - $300.00
Replace the seats on the ten mountain bikes - $250.00
Four smaller bikes for our younger campers - $250.00 ea
Dream Projects:
Install a window in the back of the 8 cabins - $800.00 ea.
Put sliding doors on the open bay garages - $3,000.00
Purchase a bunk bed with a full size mattress for all cabins - $900.ea
Tile or refinish the cabin floors - 8 cabins x $800.00 each
Replace the bunk beds in the cabins with wood beds - $500.00 each
Retreat center dining hall floor replaced - $3,000.00
Purchase an adjustable basketball goal for the outside court -$1,500
Replace all the top mattresses in the cabins -$3,250.00 |